Whole Home IAQ System Installation in Altadena: room outcome before equipment box
Whole-home IAQ packages commonly plan around $1,800 to $7,500 depending on filtration, duct corrections, accessories, and controls. is the cost framing most Altadena homeowners encounter on the first quote, and the spread inside that range is almost always engineering, not equipment. Coastal LA homes (Santa Monica, Venice, Mar Vista) need ERV preference because dewpoint stays above 55°F most summer, and outdoor air without recovery raises indoor humidity. Inland Valley homes (Tarzana, Encino, Burbank) often run HRV adequately because dry summer air does not need latent recovery. Foothill homes (Pasadena, Altadena) need filtration emphasis with the ventilation rate because outdoor PM2.5 spikes during fire season. A 1900s-1930s craftsman bungalows and Spanish Revival home rarely accepts a drop-in replacement without duct work, return enlargement, or a static-pressure correction that the previous installer skipped. The cost moves with those decisions, which is why the audit precedes the price.
Technical anchor: ASHRAE 62.2-2022 mechanical ventilation rate formula: Qfan = 0.03 × Afloor + 7.5 × (Nbr + 1) CFM. An 1,800 sq ft, 3-bedroom Los Angeles home calculates to 0.03×1800 + 7.5×4 = 54 + 30 = 84 CFM continuous outdoor air. The UV-C germicidal lamps at 253.7 nm wavelength; ASHRAE Position Document on Filtration and Air Cleaning lists 1,500–6,000 µW·s/cm² single-pass dose; coil-irradiation reduces biofilm with clear evidence, in-duct upper-air kill rates depend on residence time requirement is enforced by Manual J load math, not by guesswork. Spot exhaust verification: kitchen hood capture, bathroom fan flow with passive Energy Star Q-test.
Average summer high near 89°F with winter low around 42°F at an elevation of 1335 ft and roughly 24 miles inland. CEC Climate Zone 9. The cooling design temperature for Manual J calculations runs about 98°F, with typical Manual J load landing in the 350-450 sq ft per ton band. Marcus Reyes, P.E. signs the load calc and the airflow report; equipment ordering follows that signature, never precedes it. Electric service in Altadena is SCE (major rebuilding plan announced April 2025); gas is SoCalGas. Equipment selection should match the rebate path that utility offers when the program applies on the day the contract is signed.